INTEGRATED CAMPUS PARTNERS

Supply the campus. Secure capacity on it.

E2B4 owns and operates every system on the Central Campus, from gas-fired generation to direct-to-chip cooling. The Integrated Campus Partners program is how equipment makers, system suppliers and constructors engage with the campus before contracts are awarded: as pre-qualified suppliers, as suppliers who bring financing for the equipment they sell, and as strategic investors who secure priority access to future computing capacity.

Full-build plan6,500 MWNet onsite power generation
Full-build plan4,960 MWCritical IT load · 20 data halls
Phase One1,240 MWCritical IT load · 5 data halls
Design basis248 MWCritical IT load per hall · PUE 1.25
THREE WAYS TO PARTICIPATE

One program, three levels of commitment.

Every partner starts with a non-disclosure agreement and a technical exchange. From there, a partner chooses the level that fits.

LEVEL 1

Preferred Supplier

Exchange technical data, provide a budgetary quotation and delivery-slot visibility, and enter the pre-qualified list for your scope.

  • Early access to the basis of design
  • Pre-qualified position on the request for proposals
  • Listing on this page
LEVEL 2

Financing Partner

Bring financing for the equipment you supply: extended payment terms, pre-delivery financing, or export-credit cover from your home country. E2B4 remains the owner and operator.

  • A financed purchase order rather than a plain one
  • Export-credit pathways for Japanese, Korean and European scope
  • See the financing page
LEVEL 3

Strategic Investor

Invest in the company and receive a priority contract for future computing capacity on the campus, together with a preferred position to supply your scope at market terms.

  • Priority capacity allocation
  • Right of first offer and right to match
  • Seat in the basis-of-design review
E2B4 does not grant exclusivity at any level. Preferred positions are exercised at market terms, benchmarked by the owner’s engineer, so that lenders, independent engineers and tenants see competitive procurement.
EQUIPMENT CATEGORIES

What the campus buys.

Quantities on each page are the current planning basis and are non-binding. The Phase One power basis is three single-shaft combined-cycle blocks; the full-build planning basis is up to ten.

Direct-to-chip liquid cooling

Coolant distribution units, manifolds, cold plates, leak detection, heat rejection.

Export-credit and vendor financing

How suppliers finance the equipment E2B4 buys from them.

Gas turbines and combined-cycle blocks

Gas turbines, heat-recovery steam generators, steam turbines, air-cooled condensers.

PAGE IN PREPARATION

Generators, transformers and switchgear

Generators, step-up transformers, high- and medium-voltage switchgear, busway, power distribution, uninterruptible power.

PAGE IN PREPARATION

Battery storage and microgrid controls

Battery energy storage, microgrid controller, protection and control.

PAGE IN PREPARATION

Prefabricated modules and structural steel

Electrical rooms, prefabricated data hall modules, structural steel.

PAGE IN PREPARATION

Engineering, procurement and construction

Power island and data hall construction, commissioning.

PAGE IN PREPARATION

Processing units and servers

Supplied by tenants under the campus model.

PAGE IN PREPARATION

Manufacture on the campus

Assembly, sub-assembly and service operations on the 154-acre site.

PAGE IN PREPARATION

Last reviewed 2026-08-30. Development-stage figures reflect current planning assumptions and remain subject to final engineering, permitting, contracting and financing milestones.

STRATEGIC INVESTMENT

Capital in now. Priority capacity later.

E2B4 Corp is pursuing strategic investment from suppliers to the Central Campus. A strategic investment combines capital into the company with a priority contract for future computing capacity on the campus and a preferred position to supply the partner’s equipment at market terms. Suppliers who run their own AI workloads secure capacity at a campus they help build.

  • Priority allocation of future computing capacity, proportional to the investment
  • Right of first offer and right to match on the partner’s equipment scope, benchmarked by the owner’s engineer
  • Participation in the basis-of-design review for that scope

Securities are offered only to verified accredited investors and only through definitive offering documents. Nothing on this page is an offer to sell or a solicitation of an offer to buy any security. Suppliers interested in strategic investment receive the participation brief following execution of a non-disclosure agreement.

Request the Participation Brief

Access to company and campus materials is provided following execution of a non-disclosure agreement.